Montenegro · 10 kWp reference system
Budva solar forecast
Photo: Nick Savchenko from Kiev, Ukraine, CC BY-SA 2.0. Cropped, resized and converted to WebP by GridPassport.
Wednesday, August 5, 2026
About 47.7 kWh tomorrow
For a standard 10 kWp south-facing system in Budva, GridPassport estimates 47.7 kWh on Wednesday, August 5, 2026, with a likely range of 39.1-54.9 kWh. The strongest production window is expected at 13:00-17:00 local time.
Updated Aug 4, 2026, 08:53 PM GMT+2 · fresh snapshot- Likely range
- 39.1-54.9 kWh
- Strongest window
- 13:00-17:00
- Confidence
- high
Typical year
Solar production month by month in Budva
A standard 10 kWp system produces about 14,003 kWh in a typical year at this location. Monthly averages show seasonality; they are not a forecast for a specific year.
Values are kWh per month. Source: European Commission JRC PVGIS.
What makes Budva's solar profile different? The typical annual yield is about 1,400 kWh per installed kWp, ranking Budva #2 of 3 modelled locations in Montenegro. That is close to the median of the 3 Montenegro locations in this dataset. July is typically the strongest month and December the weakest; the stronger month produces about 2.4 times as much.
See the 12-month data
Nearby solar forecasts
Compare Budva with nearby cities
Tomorrow, in one email
Get Budva's solar forecast by email
Tomorrow's expected production, likely range and strongest hours. One useful email each day.
Method and data
Every city uses a 10 kWp system facing south at 35 degrees with 14% system losses. Tomorrow's figure combines hourly weather with GridPassport's PV production and uncertainty model. The monthly profile uses the European Commission JRC PVGIS multi-year climate series. Roof direction, shade, snow, dirt, inverter clipping and local weather can change real output.